Dates & Impressions

ADR (TÜV) inspection of gas cylinders

About every 6 to 8 week we do offer a hydraulic pressure test, the 10 years inspection (German TÜV-inspection) for tanks used in hot air balloons.

The ADR-appointment for 2018 take on:

         05th June 2018
         22nd Aug 2018
         20th Nov 2018


Please note to print out the pdf-data file and fax it to our attention at least 1 week before the inspection takes place. In generell the tanks should be with us around 1 week before the test to let us do all necessary preparation work.